Search Results (229 products found)
Bottle Water Production Line
βΉ2,500,000.00 /Pieces
Get Best Price- MOQ: As per requirement
- Category: Bottle Water Filling Machine
- Delivery Time: Depends on order
Chilling Capacity (in tons) 5 Ton, 2 Ton, 3 Ton Bottle Filling Capacity (Bottles/min) 24 BPM Material of Construction Stainless Steel,PVC,PVC and Mild Steel Control Panel With Control Panel Installation/Civil Work Installation Available Manufacturing Lead Time 30 Days
Product Code:
Bottle Water Production Line
Category: Bottle Water Filling Machine
Chilling Capacity (in tons) 5 Ton, 2 Ton, 3 Ton Bottle Filling Capacity (Bottles/min) 24 BPM Material of Construction Stainless Steel,PVC,PVC and Mild Steel Control Panel With Control Panel Installation/Civil Work Installation Available Manufacturing Lead Time 30 Days
βΉ2,500,000.00 /Pieces
Raj Innotech Private Limited